About The Customer
$12 billion turnover | 250 000 employees | 150+ locations in over 100 countries
The Challenge
Ever increasing costs associated with introducing new variants and/or models to the production line, as a result of facility inefficiency, scrap and rework – with additional delays and costs associated in operators who require on-the-line training
How We Did It
- By implementing ODIN Workstation and ODIN Linewatch throughout the entire line
- By implementing ODIN Documentation to ensure one point of data access
Final Results
- Time from concept to end-of-line production speed increased
- Visual and dynamic work instructions providing easy integration onto the line and better understanding of product and sequences for operators
- Fewer facility delays and improved OEE on new variant introductions
- Reduced scrap and rework rates
Other Benefits
- Additional failsafe’s are part of the default system features, aiding operators in ensuring that the correct parts are always used and are correctly positioned
- Live ANDON displays current production targets, line progress and status above the production line, ensuring full line transparency
- Easy-to-use, no code interface facilitates easy continuous improvement adjustments