CASE STUDY | Mahindra Electric

Products Used

ODIN Documentation

ODIN Linewatch

ODIN Workstation

DOWNLOAD CASE STUDY

About The Customer

$12 billion turnover | 250 000 employees | 150+ locations in over 100 countries

The Challenge

Ever increasing costs associated with introducing new variants and/or models to the production line, as a result of facility inefficiency, scrap and rework – with additional delays and costs associated in operators who require on-the-line training

How We Did It

  • By implementing ODIN Workstation and ODIN Linewatch throughout the entire line
  • By implementing ODIN Documentation to ensure one point of data access

Final Results

  • Time from concept to end-of-line production speed increased
  • Visual and dynamic work instructions providing easy integration onto the line and better understanding of product and sequences for operators
  • Fewer facility delays and improved OEE on new variant introductions
  • Reduced scrap and rework rates

Other Benefits

  • Additional failsafe’s are part of the default system features, aiding operators in ensuring that the correct parts are always used and are correctly positioned
  • Live ANDON displays current production targets, line progress and status above the production line, ensuring full line transparency
  • Easy-to-use, no code interface facilitates easy continuous improvement adjustments


View More Case Studies